Batı Anadolu Group chooses KHD pyro-process technology for new 5,000 t/d kiln line at Batısöke Cement plant in Turkey

The BATI ANADOLU GROUP, Batısöke Cimento Sanayii T.A.S., awarded KHD Humboldt Wedag a contract for engineering, delivery of equipment, training, and erection and commissioning advisory services for its new 5,000 tpd clinker production line. The new line will be built directly next to existing lines near the city of Söke, Aydin in in the Aegean region of Turkey.

After positive experiences with its two KHD pyrolines at their Izmir plant, which have been running since 1966, and KHD COMFLEX® grinding system, ordered in 2013, Batısöke Cimento has once again shown confidence in KHD´s advanced technology.

This project will be KHD’s second largest kiln line in Turkey and will mark the second commissioning of KHD’s Low-NOx calciner with PYROLOOP® technology in EMEA. Coupled with KHD’s proven pyroprocessing technology, this project will combine cutting-edge thermal recuperation and low emissions technology.

KHD designed core components for this contract include:

  • 5-stage preheater with PYROCLON-R® LowNOx calciner, equipped with PYROLOOP®, PYROTOP® compact mixing chamber, tertiary air duct, and
  • PYROBOX® calciner firing system for primary and secondary fuels
  • PYRORAPID® two-station rotary kiln, 5.0 m diameter x 59.0 m long
  • PYROJET® kiln burner for primary and secondary fuels
  • PFC2841 AW clinker cooler equipped with a PYROCRUSHER® System

With the installation of the new pyroline, in with the latest KHD technology, BATISÖKE, will have a clinker production line that is equipped with the most advanced pyroline technology in the market.

The commissioning is scheduled during the autumn of 2016.

Related topics

KHD adjusts forecast

After updating its annual budget, KHD Humboldt Wedag International AG (KHD), Cologne, is adjusting its forecast for the 2016 financial year accordingly.

Chief Executive Officer (CEO) resigns with immediate effect

Today the Supervisory Board of KHD Humboldt Wedag International AG (KHD), Cologne, informed the KHD Management Board about the resignation of Mr. Johan Cnossen as Chief Executive Officer and member of the Management Board with immediate effect.

Correction of Errors in KHD’s 2014 Consolidated Financial Statements – after external Audit

As informed in the ad hoc announcement dated June 19, 2015, errors were identified in the measurement of individual projects in the 2014 financial year relating to Humboldt Wedag, Inc., the US subsidiary of KHD Humboldt Wedag International AG (KHD), Cologne. In an ad hoc publication dated August 11, 2015, KHD announced a reduction of earnings before interest and taxes (EBIT) amounting to € 13.7 million and an equity reduction in an amount of € 14.9 million based on a preliminary assessment of the error. In accordance with IAS 8, the error correction was done retrospectively while preparing the Half Year Report 2015.