Cimpor Portugal to install first Pyrorotor® alternative fuel solution in Portugal

 

  • KHD signs contract to increase production capacity and alternative fuel use at Cimpor Portugal’s Alhandra cement plant.
  • The project will be the first installation of a Pyrorotor® alternative fuel reactor in Portugal.
  • Commissioning of the upgraded production line is expected in 2025.

KHD Humboldt Wedag International AG (KHD) has received a contract from Cimpor Portugal, the largest cement producer in Portugal and a member of Oyak Group, to modernize production line 7 at its Alhandra cement plant. The contract further strengthens the long-standing relationship between Oyak Group, one of Turkey’s leading cement companies, and KHD.

The project will see production capacity increased at the Alhandra plant from 3000tpd to 3600tpd, as well as allowing thermal substitution rates of more than 80+% to be achieved. It includes the first installation of KHD’s innovative Pyrorotor® alternative fuel combustion reactor in Portugal.

The scope of the engineering and supply contract comprises:

  • New HKSK 224/335 preheater ID fan.
  • New downcomer duct.
  • New preheater with 8064/5-type HEM cyclones.
  • Pyroclon® R calciner with Pyrotop® mixing chamber. The Pyroclon R will utilize fine RDF and natural gas.
  • 4m x 10m Pyrorotor® alternative fuel combustion reactor.
  • Pyrobox® coal firing system for process start-up and operation balancing.
  • Shortening of the existing kiln and installation of new kiln inlet chamber with bypass extraction.
  • New kiln drive station 2 (the existing girth gear and two pinions will be reused).
  • New kiln hood and take-off of tertiary air from the cooler roof.
  • New main kiln burner designed to use more than 50% alternative fuels (but will also be capable of burning natural gas, as well as liquid fossil and alternative fuels).
  • New Pyrofloor® PFC²829AW cooler with a Pyrocrusher® PRC 420-3ES clinker crusher.



“The decision by Cimpor Portugal to opt for KHD pyroprocessing equipment – and especially the Pyrorotor – underlines the leading market position of KHD, as well as the outstanding capability of KHD’s unique alternative fuel-processing solution,” said Matthias Mersmann, Chief Technology Officer of KHD.

The Pyrorotor is the most versatile alternative fuel equipment on the market. Designed to meet increasing market demand for efficient and cost-effective alternative fuel processing solutions, it allows very high thermal substitution rates to be achieved, with almost no fuel pre-processing, even when firing low-quality alternative fuels.

Additionally, the new KHD ProMax® suite with real time optimizers for Alhandra’s kiln plant and raw mill is part of the project scope. KHD’s holistic solution is based on a combination of machine learning technologies, AI-supported systems and KHD’s proprietary process knowledge. KHD ProMax will help Cimpor Portugal to continuously optimize the operation of its plant. On top of that, KHD ProMax is modular and fully scalable to meet any future demands of the client.

Project execution will be led by Humboldt Wedag GmbH (KHD Germany), with support from Humboldt Wedag India Pvt Ltd and the Turkish branch office of Humboldt Wedag GmbH. Commissioning of the modernized production line is scheduled for 2025.

Related topics

KHD wins three burner orders from Cementos Argos in Colombia

Cementos Argos has awarded KHD Humboldt Wedag an order for three PYROJET® Burners for coal and gas firing at its plant in Yumbo, Cali, Colombia.

Another Order from Shree Cement

After successful commissioning and handover of the KHD pyro process system at Raipur, India, in December 2015, Shree Cement has again entrusted KHD with another pyro line at their Raipur plant in Eastern India.

KHD Technology Summit 2016 – Goa, India

KHD successfully concluded its fourth Indian Technology Summit in Goa, India last month. Intense technology discussions from 88 participants representing 33 cement companies across India, Nepal, Bhutan and Sri Lanka set the backdrop for the summit.

KHD COMFLEX® Roller Press systems for ASKALE’s Akoluk and Bilecik Cement Plants in Turkey

Askale Cimento once again placed its trust in KHD’s technology and awarded KHD with two new COMFLEX® grinding units. In Akoluk the new COMFLEX® system will be installed in front of a new 100 tph ball mill. In Bilecik the COMFLEX® unit will allow Askale Cemento to increase the existing capacity from 100 tph to 210 tph @ 3800 blaine. Between 2006 and 2011 KHD supplied three kiln lines to Askale plants in Askale, Van and Gümüshane.

OYAK decides once again for KHD’s COMFLEX® roller press technology for clinker grinding at Aslan Cimento in Turkey

OYAK Aslan Cimento Sanayii T.A.S., awarded KHD Humboldt Wedag a contract for engineering and delivery of equipment to upgrade its cement grinding line. OYAK’s 7th KHD roller press will be installed at its plant in Darica-Kocaeli, Turkey.