KHD to install 3-string preheater at Shree Cement

KHD and Shree cement have a long history of bringing innovation to the Indian cement industry. Shree Cement has implemented 11 KHD high-efficiency kiln lines and many grinding stations, including 10 KHD roller presses.

Recently Shree Cement awarded KHD with new projects for three more kiln lines, each with a capacity of 6,000 tpd.

The first project is for line two at Shree’s Raipur site.

The second new line will be built in Karnataka using a 3-string preheater and the below KHD core equipment:

3-String, 6-stage Preheater, PRZ 9575
3-Pier Rotary Kiln Ø 5.4/5.0m x 75m long.
PYROJET® Burner
PYROSTEP® Clinker Cooler, PSC 3-154.16T
The project commencement date was September 02, 2016. The third project (location to be announced) will also be built using the above equipment.

With this flexible configuration, KHD will again help Shree Cement get more out of their plants.

Related topics

Annual General Meeting of shareholders elects new Supervisory Board of KHD

In today’s Annual General Meeting the shareholders of KHD Humboldt Wedag International AG (KHD) passed a resolution to reduce the number of Supervisory Board members to three persons and re-elected Ms. Eliza Suk Ching Yuen and Mr. Hubert Keusch as members of the Supervisory Board. Mr. Kangning Zou was newly elected as a member of the Supervisory Board.

KHD books another order in Russia

ZAB Zementanlagenbau GmbH Dessau a subsidiary of KHD Humboldt Wedag International AG has signed contracts totaling over € 90 million for equipment and services for a new cement plant consisting of two 3,000 tpd clinker lines. The customer, Pervaja Cementnaja Kompanija (PZK), is part of the same Group as major Russian construction company SU-155.

EUROCEMENT terminates project with KHD

ZAB Zementanlagenbau GmbH Dessau, a subsidiary of KHD Humboldt Wedag International AG, has received notice of project termination from Stavropolsky Zavod Stroitelnih Materialov, a member of the EUROCEMENT group.