KHD to install world’s first PYROROTOR® Calciner Technology for high flexible alternative fuel burning in Austria

Rohrdorfer Cement Group has awarded Cologne-based Humboldt Wedag GmbH an EPC contract for the kiln line modernization at its cement plant operations in Gmunden, Austria. The kiln modification will enable the very flexible usage of a wide range of waste fractionally pre-treated derived fuels on a high substitution rate.

The modernization project comprises the design and supply of KHD’s world´s first ever PYROROTOR® Calciner Technology as well as the replacement of the existing satellite cooler with a new generation PYROFLOOR® PFC2 clinker cooler. The existing three station rotary kiln will be fitted with a new kiln drive and a new kiln hood as well as kiln inlet and outlet.

With the installation of the new PYROROTOR® Calciner Technology from KHD the Gmunden plant will be able to burn very coarse waste-derived fuels including whole rubber tires, which will lead to drastically reduced requirements with waste pre-treatment. Therefore, the kiln modification will also emphasize on pollutant emission reduction.

New KHD technology core components are:

  • Three new preheater cyclones
  • New preheater ID-fan
  • Tertiary Air Duct
  • PYROTOP® compact Calciner mixing chamber
  • PYROROTOR® Calciner burning chamber technology
  • PYROCLON® Calciner Burning System
  • New Kiln Bypass Unit
  • Multi-fuel PYRO-JET® kiln burner for primary and secondary fuels
  • New kiln drive and kiln hood
  • PYROFLOOR® PFC2 clinker cooler equipped with a PYROCRUSHER® roller type clinker crusher

KHD services include the dismantling of existing equipment parts as well as the engineering, design, supply, and erection of new equipment including commissioning services.

Combining KHD’s proven pyro-processing technology with its cutting-edge alternative fuel burning technology with, this project underlines KHD’s environmental technologies and leading market presence on innovative technologies in the cement industry for more than 160 years.

Commissioning of the new system is scheduled for April 2019.

Related topics

EUROCEMENT group awards KHD contract for new cement plant in Stavropol / Russia

Leading Russian cement producer EUROCEMENT placed an order for more than € 80 million with KHD for a new cement plant to be built in Stavropol, Russia. The Moscow-based EUROCEMENT group is among the top ten cement producing companies in the world.

KHD awarded € 100 million project in Malaysia

Straits Cement, a 100% subsidiary of the Malaysian YTL Group, has awarded KHD with a € 100 million contract to build a new, fully integrated cement production facility with a capacity of 5000 tons of cement per day and will be located near Kuantan, Malaysia, approximately 260 kilometers east of Kuala Lumpur.

KHD posts EBIT margin of 7.5% in 2011 despite fall in revenue – modest expectations for 2012

KHD Humboldt Wedag International AG (KHD), one of the world’s leading suppliers of equipment and services for the cement industry, generated Group revenue of € 234.6 million in the 2011 financial year. The 18.2% year-on-year reduction is primarily attributable to delayed projects. However, KHD succeeded in maintaining a largely unchanged EBIT margin of 7.5% (previous year: 8.7%).