KHD to Supply New Clinker Production Lines for Lafarge Exshaw and Ravena Plants

KHD Humboldt Wedag International AG’s US-based office, Humboldt Wedag, Inc., is executing two orders with Lafarge North America Inc. and Lafarge Canada Inc. (Lafarge) for engineering, delivery of equipment, and site services of new clinker production lines at their Exshaw and Ravena plants. KHD’s scope of supply for the projects begins with the raw material feed and ends at clinker handling.

Both plants will utilize the same KHD environmentally friendly and state-of-the-art core equipment, including:

5 stage single-string KHD Preheaters PR9067/5

PYROCLON® Low NOX calciners with PYROTOP® and PYROLOOP®

KHD PYROFLOOR® Clinker Coolers PFC741 with PYROCRUSHER® PRC 420-5

3 pier KHD Rotary Kilns

KHD Low NOX PYROJET® and PYROBOX® Burners

KHD MKD and HKD process fans

Additionally, KHD will supply SNCR systems to control NOX emissions.

For Exshaw, located approximately 1,400 meters above sea level on the edge of the Rocky Mountains in Alberta, Canada, equipment delivery is currently underway. In addition to the core KHD equipment above, a KHD kiln bypass system will be supplied for this project. KHD also is incorporating an owner supplied Pfeiffer raw mill into the system. Other auxiliary equipment included consists of material handling systems; dosing systems for raw material, blending, kiln feed, and coal systems; as well as engineering and supply of structural steel, ducts, and chutes.

The Ravena project, located approximately 50 meters above sea level near Albany, New York, will utilize the same KHD core equipment above. KHD is also incorporating an owner supplied Pfeiffer Mill and supplying similar auxiliary equipment scope as well as structural steel, ducts, and chutes. In addition a coal grinding system is included for this project.

KHD’s flexibility in engineering and equipment design was important to ensure that these environmentally friendly plants meet all of the requirements of Lafarge and the regulatory agencies. Our history of successful projects with Lafarge and flexibility in meeting these requirements played a large role in winning these orders.

Related topics

Holcim awards KHD group € 69 million order for 9,000 tpd cement plant in India

KHD Humboldt Wedag International AG subsidiaries, Humboldt Wedag India, Pvt. Ltd. and Humboldt Wedag GmbH (collectively “KHD”) received an order from Holcim Group company ACC Limited, India, for a new 9,000 tpd cement plant. The total project value, of € 69 million, consists of a euro portion of € 19.8 million and an Indian rupee portion equivalent to € 49.2 million. The plant will be built in Jamul, Chhattisgarh, India and is scheduled for commissioning in May 2015.

Project postponements force KHD to revise revenue guidance 2012

Postponements in the execution of certain projects have forced KHD Humboldt Wedag International AG to revise its 2012 revenue guidance. The company expects to achieve 2012 full year revenues between € 210 – € 220 mio.
EBIT margin guidance of 2% – 4% remains unchanged.

Cancellation of the Annual General Meeting

The KHD Humboldt Wedag International AG management board is hereby cancelling the Annual General Meeting, which was scheduled for July 27, 2012.
The company will announce a new meeting date next week.