KHD to Supply New Clinker Production Lines for Lafarge Exshaw and Ravena Plants

KHD Humboldt Wedag International AG’s US-based office, Humboldt Wedag, Inc., is executing two orders with Lafarge North America Inc. and Lafarge Canada Inc. (Lafarge) for engineering, delivery of equipment, and site services of new clinker production lines at their Exshaw and Ravena plants. KHD’s scope of supply for the projects begins with the raw material feed and ends at clinker handling.

Both plants will utilize the same KHD environmentally friendly and state-of-the-art core equipment, including:

5 stage single-string KHD Preheaters PR9067/5

PYROCLON® Low NOX calciners with PYROTOP® and PYROLOOP®

KHD PYROFLOOR® Clinker Coolers PFC741 with PYROCRUSHER® PRC 420-5

3 pier KHD Rotary Kilns

KHD Low NOX PYROJET® and PYROBOX® Burners

KHD MKD and HKD process fans

Additionally, KHD will supply SNCR systems to control NOX emissions.

For Exshaw, located approximately 1,400 meters above sea level on the edge of the Rocky Mountains in Alberta, Canada, equipment delivery is currently underway. In addition to the core KHD equipment above, a KHD kiln bypass system will be supplied for this project. KHD also is incorporating an owner supplied Pfeiffer raw mill into the system. Other auxiliary equipment included consists of material handling systems; dosing systems for raw material, blending, kiln feed, and coal systems; as well as engineering and supply of structural steel, ducts, and chutes.

The Ravena project, located approximately 50 meters above sea level near Albany, New York, will utilize the same KHD core equipment above. KHD is also incorporating an owner supplied Pfeiffer Mill and supplying similar auxiliary equipment scope as well as structural steel, ducts, and chutes. In addition a coal grinding system is included for this project.

KHD’s flexibility in engineering and equipment design was important to ensure that these environmentally friendly plants meet all of the requirements of Lafarge and the regulatory agencies. Our history of successful projects with Lafarge and flexibility in meeting these requirements played a large role in winning these orders.

Related topics

KHD posts EBIT margin of 7.5% in 2011 despite fall in revenue – modest expectations for 2012

KHD Humboldt Wedag International AG (KHD), one of the world’s leading suppliers of equipment and services for the cement industry, generated Group revenue of € 234.6 million in the 2011 financial year. The 18.2% year-on-year reduction is primarily attributable to delayed projects. However, KHD succeeded in maintaining a largely unchanged EBIT margin of 7.5% (previous year: 8.7%).

KHD Concludes Negotiations on New Bank Guarantee Bonding Facility Totaling € 130,000,000

Claudius Peters Projects GmbH (“CPP”) and KHD Humboldt Wedag GmbH (“KHD”) have settled all disputes relating to or arising out of alleged patent infringement, validity of, and/or breach of intellectual property rights in and to the ETA Cooler technology and other related matters.

KHD Humboldt Wedag International AG: Settlement of a dispute with Claudius Peters Projects GmbH

Effective from 1st of February, 2020, Matthias Mersmann has been appointed by the Supervisory Board as a new member of the Management Board of KHD Humboldt Wedag International AG. He contributes his long-term expertise in the technology of cement manufacturing processes and equipment design which he has acquired in various executive positions with OEM suppliers as well as independent consultant.