More Good News from KHD in Turkey

KHD’s activity in the Turkish market is continuing to produce positive results, with an order for a new 3,500 t/d clinker production line at the Bolu Cimento’s Kazan plant and successfully completed recent performance test for KCS Kahramanmaras Cimento’s Maras Kiln Line II.

Bolu Cimento (OYAK)
Once again showing its confidence in KHD´s advanced technology, the OYAK Group awarded KHD with an order for a new 3,500 t/d clinker production line at the Bolu Cimento’s Kazan plant, located near Ankara, Turkey. The contract awards KHD the order for engineering, equipment supply, as well as advisory services for erection and commissioning. Core KHD equipment to be supplied for the Pyroprocessing system includes:

  • 5-stage KHD Preheater with PYROCLON®-R LowNOX calciner, equipped with PYROTOP® compact mixing chamber, tertiary air duct with dust settling chamber, and PYROBOX® calciner firing system for coal dust.
  • PYRORAPID® two-tire rotary kiln, with a diameter of 4.4 m.
  • PYRO-JET® kiln burner for petcoke.
  • PYROFLOOR® clinker cooler equipped with a PYROCRUSHER® System.

The new kiln line will be erected next to the existing cement grinding unit and commissioning is scheduled for the spring of 2015.

Kahramanmaras Cimento (KIPAS)
The recently commissioned KCS Kahramanmaras Cimento’s Maras Kiln Line II was installed next to the existing Maras I Line, which was also installed by KHD. The new line, which has KHD supplied main equipment and state-of-the-art KHD technology for alternative fuel firing, produced impressive results at its recent performance test.

The test was conducted using a mixture of approximately 40% petcoke and 60% lignite (of the same quality and fineness) for the main burner and calciner burner.

KHD continues to strengthen its position in the fast growing market in Turkey with repeat orders and successes such as these.

Related topics

KHD books another order in Russia

ZAB Zementanlagenbau GmbH Dessau a subsidiary of KHD Humboldt Wedag International AG has signed contracts totaling over € 90 million for equipment and services for a new cement plant consisting of two 3,000 tpd clinker lines. The customer, Pervaja Cementnaja Kompanija (PZK), is part of the same Group as major Russian construction company SU-155.

EUROCEMENT terminates project with KHD

ZAB Zementanlagenbau GmbH Dessau, a subsidiary of KHD Humboldt Wedag International AG, has received notice of project termination from Stavropolsky Zavod Stroitelnih Materialov, a member of the EUROCEMENT group.

KHD: New EBIT guidance for 2013

Due to unexpected profit deterioration in the latest cost estimations of a few major projects, KHD Humboldt Wedag International AG (KHD) will not reach its margin guidance for the 2013 financial year.
According to preliminary unaudited figures, KHD will close 2013 with a significant increase in revenues, EBIT between € 1 – 2 million and EBIT margin of less than 1.0%.