OYAK decides once again for KHD’s COMFLEX® roller press technology for clinker grinding at Aslan Cimento in Turkey

OYAK Aslan Cimento Sanayii T.A.S., awarded KHD Humboldt Wedag a contract for engineering and delivery of equipment to upgrade its cement grinding line. OYAK’s 7th KHD roller press will be installed at its plant in Darica-Kocaeli, Turkey.

The contract to install a new COMFLEX® grinding system will increase the capacity of cement grinding unit no. 1, by more than 100% and save approx. 20% energy, allowing Aslan Cimento to maintain their position as one of the most significant companies in the Marmara region.

KHD’s scope includes the engineering and delivery of mechanical and electrical equipment, as well as advisory supervision of erection and commissioning for the new COMFLEX® SC20-3250. This will be KHD’s 4th COMFLEX® grinding unit and 15th roller press system with V-Separator in Turkey.

The core equipment to be designed and delivered by KHD, as specified in this contract, includes:

Clinker Grinding System / COMFLEX® SC20-3250

  • Roller Press RPZ 20-170/180 with ROLCOX® system for control and monitoring
  • Cascade separator, type VS 620 as static classifier
  • High efficiency separator SEPMASTER, type SKS-VC 3250 as dynamic classifier
  • System fan HKF 190/280

The new COMFLEX® system will be integrated with the existing ball milll system. However, one of the primary reasons Aslan Cimento chose KHD’s COMFLEX® for this project is it‘s ability to produce finished product without a ball mill unit.

With the installation of a COMFLEX® grinding system, in its newest design, Aslan Cimento, will have a system that is equipped with the most advanced grinding technology in the market.

The commissioning of the new COMFLEX® system is planned for the 2016.

Related topics

KHD posts EBIT margin of 7.5% in 2011 despite fall in revenue – modest expectations for 2012

KHD Humboldt Wedag International AG (KHD), one of the world’s leading suppliers of equipment and services for the cement industry, generated Group revenue of € 234.6 million in the 2011 financial year. The 18.2% year-on-year reduction is primarily attributable to delayed projects. However, KHD succeeded in maintaining a largely unchanged EBIT margin of 7.5% (previous year: 8.7%).

KHD Concludes Negotiations on New Bank Guarantee Bonding Facility Totaling € 130,000,000

Claudius Peters Projects GmbH (“CPP”) and KHD Humboldt Wedag GmbH (“KHD”) have settled all disputes relating to or arising out of alleged patent infringement, validity of, and/or breach of intellectual property rights in and to the ETA Cooler technology and other related matters.

KHD Humboldt Wedag International AG: Settlement of a dispute with Claudius Peters Projects GmbH

Effective from 1st of February, 2020, Matthias Mersmann has been appointed by the Supervisory Board as a new member of the Management Board of KHD Humboldt Wedag International AG. He contributes his long-term expertise in the technology of cement manufacturing processes and equipment design which he has acquired in various executive positions with OEM suppliers as well as independent consultant.