The Pyrorotor® Keeps Convincing Ssangyong Cement

The demand for efficient and cost-effective alternative fuel-processing solutions in the cement industry is continuously increasing. Ssangyong Cement C&E Company Ltd. has understood the unique advantages of KHD’s Pyrorotor® and ordered another unit for their Donghae plant in South Korea.

Already the fourth installation in one plant

Ssangyong Cement C&E Company Ltd (Korea) awarded another supply and engineering contract to Humboldt Wedag GmbH for the modernization of clinker production line five of their Donghae plant. This project marks the fourth Pyrorotor® installation in Ssangyong’s plant.

The Pyrorotor® will enable Ssangyong to continuously achieve a thermal substitution rate (TSR) above 85% in the calciner. At the same time, thanks to the principle of staged combustion, Pyrorotor® will also ensure that NOX emissions can be kept low to satisfy the local emission limits in South Korea.

KHD’s scope includes the engineering and supply of mechanical equipment for the clinker production as well as electrical equipment for the overall modernization of the production process. Aside from the installation of the Pyrorotor®, the modernization of production line five also includes the replacement of the existing calciner with a new Pyroclon® R and a new Pyrofloor²® walking floor clinker cooler.

The overall equipment scope consists of:

  • Pyroclon® R calciner with Pyrotop® mixing chamber
  • Pyrorotor® alternative fuel combustion reactor
  • Pyrobox® coal firing system for process start-up and operation balancing
  • Replacement of stage four cyclones with new high-efficiency cyclones
    for calciner connection and an overall pressure drop reduction
  • A new kiln inlet chamber with orifice, kiln hood and tertiary air ducts
  • A new Pyrofloor® PFC²738AW with Pyrocrusher® PRC 420-4ES


The project scope is the same as the modernization contract of line four of Donghae plant, which was signed in February 2021 and currently is in commissioning.

The project execution will be a joint effort of Humboldt Wedag GmbH and as leading entity and Humboldt Wedag India as supporting partner. The commissioning of the modernized line five is scheduled for the fourth quarter of 2023.

The repeated decision for KHD’s equipment and know-how of process optimization underlines the great relationship to Ssangyong Cement and their trust in KHD as a long-term partner. Moreover, the by now eighth Pyrorotor® installation in South Korea underlines the performance and capability of KHD’s ingenious alternative
fuel-processing solution. With several Pyrorotor® upgrades currently in negotiation, we expect further clients in South Korea, but also in other regions worldwide, to opt for Pyrorotor®, the only equipment that offers cost-effective alternative fuel processing combined with unmatched fuel flexibility.

You can download this sales news as PDF here.

Related topics

KHD strengthens Management Board

Effective from 1st of February, 2020, Matthias Mersmann has been appointed by the Supervisory Board as a new member of the Management Board of KHD Humboldt Wedag International AG. He contributes his long-term expertise in the technology of cement manufacturing processes and equipment design which he has acquired in various executive positions with OEM suppliers as well as independent consultant.

KHD signs next Pyrorotor contract in South Korea

Asia Cement Company Ltd (Korea) awarded Humboldt Wedag GmbH, a subsidiary of KHD Humboldt Wedag International AG, with a supply and engineering contract for the modernization of its 3rd clinker production line located close to Jecheon-si, Korea. The target of the upgrade project is to increase the alternative fuel substitution rate to above 85% of calciner fuel, as well as the reduction of NOx to satisfy local emission limits.

KHD to upgrade the raw material grinding unit of thomas zement in Erwitte, Germany

thomas zement recently awarded Humboldt Wedag GmbH (KHD) a brown field EPC contract for upgrading its raw material grinding plant in Erwitte, Germany.

New Chairman of KHD’s Supervisory Board

At its meeting today the Supervisory Board of KHD Humboldt Wedag International AG (KHD), Cologne, has elected Mr. Shaohua Jin as the new Chairman. Mr. Jin was appointed as member of the Supervisory Board on Friday by resolution of the District Court of Cologne replacing Mr. Da Hua, who previously resigned from the Supervisory Board. The previous Chairman, Gerhard Beinhauer, will continue to serve as Vice Chairman of KHD’s Supervisory Board.

KHD adjusts forecasted result

KHD Humboldt Wedag International AG (KHD), Cologne, adjusts the forecast for its adjusted earnings before interest and taxes (EBIT) for the 2018 financial year as part of the updating of the annual planning. Due to cost overruns in project execution, the adjusted EBIT is now expected to be at about the same level as in the previous year.