KHD wins largest upgrade project in Turkey

KHD has been awarded the contract to upgrade NUH Cimento’s existing ball mill grinding unit in Hereke-Kocaeli located in Marmara region of Turkey. With this upgrade, the plant will increase the grinding capacity from 212 tph to 408 tph @ 4.000 Blaine. This will be the largest upgrade project to date for KHD.

NUH Cimento has entrusted KHD with the upgrade of their ball mill system. The system contains one of the largest ball mills in the world (Ø 5,8 m x 17,84 m – 10,4 MW motor drive) and has been in operation for approximately 9 years in Hereke, Turkey. For the upgrade, KHD will install 2 new identical COMFLEX® grinding systems next to each other which can be operated independently for finish cement grinding or with ball mill on semi finish grinding mode. This project will allow NUH Cimento to strengthen their position as one of the most significant companies in Marmara Region of Turkey.

The contract for engineering and equipment supply includes the following KHD core equipment:

2 COMFLEX® SC16-3250 Clinker Grinding Units

  • 2 x Roller Press RPM 16-170/180 with ROLCOX® system for control and monitoring
  • 2 x Type VS 620 cascade separators as static classifiers
  • 2 x SEPMASTER type SKS-VC 3250, high efficiency separators as dynamic classifiers
  • 2 x HKSK 190/265 system fan
  • 2 year Spare parts package including 1 spare roller

The concept includes two new COMFLEX® compact systems, in combination with the existing ball mill system. This concept, along with the 25 positive references regarding KHD roller presses in Turkey, ultimately won the customer over. Additionally, the new compact system will allow for a significant reduction in the installation height of the COMFLEX® system.

With the installation of the COMFLEX® grinding system in its newest compact design, NUH Cimento will have 2 identical systems that are equipped with the most advanced grinding technology on the market.

The commissioning of the new COMFLEX® system at NUH Cimento, in combination with the existing ball mill system, is planned for the beginning of 2018.

Related topics

KHD awarded € 100 million project in Malaysia

Straits Cement, a 100% subsidiary of the Malaysian YTL Group, has awarded KHD with a € 100 million contract to build a new, fully integrated cement production facility with a capacity of 5000 tons of cement per day and will be located near Kuantan, Malaysia, approximately 260 kilometers east of Kuala Lumpur.

KHD posts EBIT margin of 7.5% in 2011 despite fall in revenue – modest expectations for 2012

KHD Humboldt Wedag International AG (KHD), one of the world’s leading suppliers of equipment and services for the cement industry, generated Group revenue of € 234.6 million in the 2011 financial year. The 18.2% year-on-year reduction is primarily attributable to delayed projects. However, KHD succeeded in maintaining a largely unchanged EBIT margin of 7.5% (previous year: 8.7%).

KHD Concludes Negotiations on New Bank Guarantee Bonding Facility Totaling € 130,000,000

Claudius Peters Projects GmbH (“CPP”) and KHD Humboldt Wedag GmbH (“KHD”) have settled all disputes relating to or arising out of alleged patent infringement, validity of, and/or breach of intellectual property rights in and to the ETA Cooler technology and other related matters.