KHD wins largest upgrade project in Turkey

KHD has been awarded the contract to upgrade NUH Cimento’s existing ball mill grinding unit in Hereke-Kocaeli located in Marmara region of Turkey. With this upgrade, the plant will increase the grinding capacity from 212 tph to 408 tph @ 4.000 Blaine. This will be the largest upgrade project to date for KHD.

NUH Cimento has entrusted KHD with the upgrade of their ball mill system. The system contains one of the largest ball mills in the world (Ø 5,8 m x 17,84 m – 10,4 MW motor drive) and has been in operation for approximately 9 years in Hereke, Turkey. For the upgrade, KHD will install 2 new identical COMFLEX® grinding systems next to each other which can be operated independently for finish cement grinding or with ball mill on semi finish grinding mode. This project will allow NUH Cimento to strengthen their position as one of the most significant companies in Marmara Region of Turkey.

The contract for engineering and equipment supply includes the following KHD core equipment:

2 COMFLEX® SC16-3250 Clinker Grinding Units

  • 2 x Roller Press RPM 16-170/180 with ROLCOX® system for control and monitoring
  • 2 x Type VS 620 cascade separators as static classifiers
  • 2 x SEPMASTER type SKS-VC 3250, high efficiency separators as dynamic classifiers
  • 2 x HKSK 190/265 system fan
  • 2 year Spare parts package including 1 spare roller

The concept includes two new COMFLEX® compact systems, in combination with the existing ball mill system. This concept, along with the 25 positive references regarding KHD roller presses in Turkey, ultimately won the customer over. Additionally, the new compact system will allow for a significant reduction in the installation height of the COMFLEX® system.

With the installation of the COMFLEX® grinding system in its newest compact design, NUH Cimento will have 2 identical systems that are equipped with the most advanced grinding technology on the market.

The commissioning of the new COMFLEX® system at NUH Cimento, in combination with the existing ball mill system, is planned for the beginning of 2018.

Related topics

KHD Humboldt Wedag International AG: Settlement of a dispute with Claudius Peters Projects GmbH

Effective from 1st of February, 2020, Matthias Mersmann has been appointed by the Supervisory Board as a new member of the Management Board of KHD Humboldt Wedag International AG. He contributes his long-term expertise in the technology of cement manufacturing processes and equipment design which he has acquired in various executive positions with OEM suppliers as well as independent consultant.

KHD Humboldt Wedag International AG: Update of revenue guidance for 2011

KHD Humboldt Wedag International AG (KHD), one of the leading suppliers of plant and services for the cement industry, has announced today that previously projected revenues (August 2011) of € 270 million for the 2011 financial year will not be reached. Uncertainty in some markets, in particular India, has led to lower cement demand and thus customer postponements in project execution. Nevertheless KHD retains its EBIT guidance of € 16 – € 19 million for the current financial year. KHD will publish Q3 2011 financial results on November 11, 2011.

Change in Management Board – Finance

Manfred Weinandy, CFO of KHD Humboldt Wedag International AG has decided to leave the company for personal reasons. The supervisory board has agreed to accept the resignation of Mr Weinandy from office with effect as of today as well as to the mutual cancellation of his service agreement.