The first Pyrorotor® contract in Turkey

The topics of decarbonization and fossil fuel substitution continue to drive developments and changes in the cement industry. At the forefront of this trend is the Pyrorotor® from KHD. A modular add-on to any existing calciner, the Pyrorotor® allows very high thermal substitution rates (TSR) with almost no pre-processing of even the lowest-quality alternative fuels.

Ultimate fuel flexibility paired with NOX emission reduction

After demonstrating continuous success over the last few years, predominantly in the Asia Pacific region, KHD has now received the first Pyrorotor® order in Turkey. This latest order underlines the growing demand for sustainable and cost-effective utilization of alternative fuels – a demand that is now reaching new countries and market regions.

KÇS Kipaş Çimento A.Ş. awarded a supply and engineering contract to Humboldt Wedag GmbH for a Pyrorotor® to be installed on production line one of their plant in Kahramanmaraş, Turkey.

The Pyrorotor® will enable KÇS to continuously achieve a TSR above 90% in the calciner. At the same time, thanks to the principle of staged combustion, the upgrade will also ensure NOX emissions from the pyroprocess are kept below 800mg NO2/Nm3.

Contract scope consists of design, engineering and supply of all equipment for the Pyrorotor®. There is no need to interrupt production during the project erection phase. Only a brief stoppage is foreseen to assemble the gas duct connections shortly before the final commissioning, which is scheduled for early in the third quarter of 2023.

This project marks the 11th Pyrorotor® unit contracted worldwide. It underlines the strong demand for solutions that facilitate the use of alternative fuels. The ingenuity of Pyrorotor® is that, in contrast to all other equipment currently available in the market, it allows cement producers to use any type and quality of alternative fuel without the effort and cost of pre-processing these materials. As a result, Pyrorotor® can significantly improve fuel availability and cost for any cement producer.

With the Pyrorotor®, KHD continues to demonstrate its expertise and capability for highly reliable and energy-efficient pyroprocessing solutions and reinforces its position as market leader in the Turkish cement industry.

You can download this sales news as PDF here.

Related topics

KHD strengthens Management Board

Effective from 1st of February, 2020, Matthias Mersmann has been appointed by the Supervisory Board as a new member of the Management Board of KHD Humboldt Wedag International AG. He contributes his long-term expertise in the technology of cement manufacturing processes and equipment design which he has acquired in various executive positions with OEM suppliers as well as independent consultant.

KHD signs next Pyrorotor contract in South Korea

Asia Cement Company Ltd (Korea) awarded Humboldt Wedag GmbH, a subsidiary of KHD Humboldt Wedag International AG, with a supply and engineering contract for the modernization of its 3rd clinker production line located close to Jecheon-si, Korea. The target of the upgrade project is to increase the alternative fuel substitution rate to above 85% of calciner fuel, as well as the reduction of NOx to satisfy local emission limits.

KHD to upgrade the raw material grinding unit of thomas zement in Erwitte, Germany

thomas zement recently awarded Humboldt Wedag GmbH (KHD) a brown field EPC contract for upgrading its raw material grinding plant in Erwitte, Germany.

New Chairman of KHD’s Supervisory Board

At its meeting today the Supervisory Board of KHD Humboldt Wedag International AG (KHD), Cologne, has elected Mr. Shaohua Jin as the new Chairman. Mr. Jin was appointed as member of the Supervisory Board on Friday by resolution of the District Court of Cologne replacing Mr. Da Hua, who previously resigned from the Supervisory Board. The previous Chairman, Gerhard Beinhauer, will continue to serve as Vice Chairman of KHD’s Supervisory Board.

KHD adjusts forecasted result

KHD Humboldt Wedag International AG (KHD), Cologne, adjusts the forecast for its adjusted earnings before interest and taxes (EBIT) for the 2018 financial year as part of the updating of the annual planning. Due to cost overruns in project execution, the adjusted EBIT is now expected to be at about the same level as in the previous year.